Home >

Xiangcheng Releases Leather Industry (2014-2020) Publicity On Environmental Impact

2014/10/12 0:31:00 283

Xiangcheng CityReleased LeatherIndustryEnvironmentPublicity

 

I. planning overview


According to the "12th Five-Year" development plan, the requirements of deep structural adjustment and the development needs of leather enterprises, we will make breakthroughs and revitalization of the leather industry as soon as possible, and strive to make the city into an environment-friendly green tannery production base with a certain influence in the country by 2020.

In the near future, by 2015, it will produce 140 million square feet of finished leather, 5 million pairs of footwear products and 4 million leather products, and the long-term scale will reach 280 million square feet of finished products, 15 million pairs of footwear products and 10 million pieces of leather products by 2020.

There are two bases to build: first, build a deep processing base for the leather industrial park in the industrial gathering area, focus on the production of the front water works section of the city leather enterprise, collect and treat the waste containing chromium, give full play to the advantages of Boao leather industry's environmental protection technology; two, build the Ding Ji, the mausoleum and the official leather primary processing and production base, and disperse the later stage processes, which can not only reduce pollution, but also realize energy conservation.

Stretch the leather industry chain, produce leather shoes, leather products and other products.

Two, environmental impact, environmental carrying capacity analysis and planning development direction of planning projects.

1. Analysis of environmental carrying capacity

Water resources and water environmental carrying capacity: Xiangcheng water supply plant is the main source of water, and groundwater is used as supplementary water supply. The existing enterprise wastewater is treated by the sewage treatment plant in the factory and then enters the surface water body.

After the implementation of the plan, the enterprises have less influence on the surface water of Xiang City, Ding Ji, Mu Ling and Guan Hui town by strengthening cleaner production, improving the technology and equipment, reducing the amount of sewage discharge and pollutant discharge.

Environmental air bearing capacity: exhaust gas is mainly produced by various enterprises in the process of production of exhaust gas, it is necessary to deal with emissions after reaching the standard.

The bearing capacity of sound environment is as follows: the present situation of planning area is better, the sound environment quality is better, and the industrial noise is less affected by the sound insulation and distance attenuation of the industrial noise to the surrounding sound environment; the added traffic noise has little influence on the surrounding sound environment.

Environmental carrying capacity of solid waste: the domestic refuse of the enterprises in the planning area is pported uniformly by the sanitation department to the sanitary landfill of the domestic waste landfill site, and the industrial solid waste is disposed of according to the nature of solid waste after being reduced, resourceful and harmless.

Carrying capacity of ecological environment: the planning area is artificial ecology, and there are no national protected animals and rare plants in the region. The implementation of the plan has little impact on the local ecological environment.

2, planning and development direction

The direction of planning and development is to enrich varieties of colors, improve technology, pay attention to cleaner production and strengthen the development of scale.

Three, the key points of environmental impact assessment

The development and planning of leather industry in Xiangcheng are more reasonable and reasonable. The layout and layout of the leather industry are generally reasonable. The principles of planning pollution prevention and control measures are feasible.

Four. The way to ask for a copy of the report

In the construction and EIA unit, the public can receive simplified copies and supplementary information from the construction units and EIA units in the form of telephone, fax, e-mail and letters.

Five, the main scope and matters for public consultation.

Scope of consultation: the public who are affected by planning projects and concerned about planning and construction.

Opinions on planning; opinions on environmental protection measures for planning projects; and opinions on environmental impact statement (simplified version) of planning projects.

Six. The form of soliciting public opinions.

If you need to know more details about the EIA work of this project, you can contact the construction units and EIA units by telephone, fax, e-mail, correspondence and access.

The specific links are as follows:

Entrusted unit contact mode

Name of the entrusted unit: Xiangcheng Environmental Protection Bureau

Contact: long Zhiyong: 0394-4232275 address: West Section of Lianhua Road, Xiangcheng.

Undertake the contact method of the environmental impact assessment unit of this project.

Name: Henan Zhengda environmental science and technology consulting engineering Co., Ltd.

Mailing address: Zhengzhou City Cultural Road, 18 floor, Jin Guo commercial building, mailbox: zhengdahuanbao@126.com

Contact: Liu Na contact telephone: 0371-63913759

Seven, feedback time:

Please give your comments to the EIA units or construction units within 10 working days after the announcement.

Xiangcheng Environmental Protection Bureau

Henan Zhengda environmental science and technology consulting engineering Co., Ltd.

October 8, 2014


  • Related reading

Shandong Quality Supervision Bureau Announced: The Third Quarter Of 2014 Student Clothing Inspection Results: 15 Batches Of Products Failed

Departmental notices
|
2014/10/10 0:56:00
28

春晖股份:筹划重大资产重组事项 8日起停牌

Departmental notices
|
2014/10/8 16:09:00
18

Private Banks Expand Small And Micro Businesses With "Drip Irrigation" Faucets.

Departmental notices
|
2014/10/5 1:20:00
39

Huaying Agriculture: Announcement On The Cancellation Of Hualong Down Company

Departmental notices
|
2014/9/30 18:33:00
21

棉企观望棉花价格改革:不知道补贴如何发放

Departmental notices
|
2014/9/24 19:52:00
46
Read the next article

温州皮草商:桦南招远皮革城人文环境受欢迎

​  近日,桦南招远皮革城盛装开幕。10月3日,记者一行数人随着熙熙攘攘的客流“挤”进了宽敞明亮、皮草商品琳琅满目的桦南招远皮革城。